=Method Group
More information about this page | Visit www.methodcompreg.com
This page is the public summary of the =Method account holder named above, showing the Tasks for which competency has been assessed and the associated status. Further detail on the Competency Register may be found at www.methodcompreg.com.
The =Method Competency register is based on the following key principles
* The Competency Register recognises that it is sometimes clear at interview that an account holder should be awarded a particular Task status, but it is not possible for them to provide evidence of projects completed with previous employers. This position is recognised by the
symbol – which indicates that the account holder needs to complete 4 peer reviewed projects which will be subject to additional scrutiny.
close popup
To access this account please enter the password below. this password will be available from Mike only.
| Task | Level of Competency |
Date | Verification Status |
| 61511-FSM | Functional Safety Management | Professional | 2022-02-05 |
Pending
|
|
| Projects |
Authoring FS Management Plans while working at Systems Integrator specialising in functional safety. |
2020-11-01 |
|
| 61511-FSM | Functional Safety Management | Professional | 2022-02-05 |
Pending
|
|
| Task Relevant Training (exam) |
TUV Sud 61511, FSP TP17051306 |
2017-03-09 |
|
| 61511-SRS | Safety Requirement Specification | Master | 2022-02-05 |
Pending
|
|
| Projects | Authored and checked SRS. | 2022-02-05 |
|
| 61511-FSA1 | Stage 1 Functional Safety Assessment | Professional | 2023-04-12 |
Pending
|
|
| Projects | Knowledge of FSA1 lifecycle activities through experience authoring LOPA documents at Sella Controls | 2020-11-09 |
|
| 61511-DES H/W | Clause 11 - SIS Design and Engineering | Master | 2022-02-05 |
Pending
|
|
| Peer Reviewed Project | P-2735. Front-End Engineering Design for SIFs on Tanker Bay application. Co-author of report. | 2022-05-24 |
|
| 61511-DES H/W | Clause 11 - SIS Design and Engineering | Master | 2022-02-05 |
Pending
|
|
| Projects | Hardware design of SIS loops including drawings, schedules, specifications and other design docs. | 2020-11-01 |
|
| 61511-DES S/W | Clause 12 - SIS Application Program Development | Master | 2022-02-05 |
Pending
|
|
| Projects | Software design (FBD, SFC, ST) for SIS loops including design specification. | 2020-11-01 |
|
| 61511-SILV&C | SIL Verification and Calculation | Master | 2022-02-05 |
Pending
|
|
| Projects | Authored and checked SIL verification reports, FMEA. | 2020-11-01 |
|
| 61511-FAT/SAT | Clauses 13 / 15 - Factory Acceptance Test / SIS Safety Validation | Master | 2022-02-05 |
Pending
|
|
| Projects | Authored and checked FAT/SAT procedures. Site engineer at numerous SATs | 2020-11-01 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Master | 2022-02-05 |
Pending
|
|
| Peer Reviewed Project | P-2832. FSA 2 of offshore gas platform. Joint author of report (DES, AP and FAT checklists). | 2023-02-27 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Master | 2022-02-05 |
Pending
|
|
| P-2767. FSA 2 (part of FSA 1-3) of Chlorine Manufacturer site. Author of software related checklists and Checker of hardware related checklists and summary report. | 2022-08-26 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Master | 2022-02-05 |
Pending
|
|
| Projects | Carried out multiple FSA 2. | 2020-11-01 |
|
| 61511-INSTALL | Clause 14 SIS Installation and Commissioning | Master | 2022-02-05 |
Pending
|
|
| Projects | Authored and checked method statements, risk assessments. Site engineer to commission and validate SIS. | 2020-11-01 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2022-02-05 |
Pending
|
|
| Projects | Author FSA3 Veolia Norwood P-2635 | 2023-02-07 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2022-02-05 |
Pending
|
|
| Carried out multiple FSA 3 | 2020-11-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Professional | 2022-02-05 |
Pending
|
|
| Projects | Support to clients during O&M activities | 2020-11-01 |
|
| 61511-LEGACY | Management of Legacy / Installed Systems | Professional | 2022-02-05 |
Pending
|
|
| Projects | Support to clients with legacy SIS | 2020-11-01 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Professional | 2023-01-22 |
Pending
|
|
| Projects |
Author of FSA 4 Livent, Bromborough, P-2876 |
2023-03-16 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Professional | 2023-01-22 |
Pending
|
|
|
Checker of FSA 4 Petroineos Grangemouth P-2847 |
2023-03-09 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Professional | 2023-01-22 |
Pending
|
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Professional | 2023-01-22 |
Pending
|
|
| 61511-FSA5 | Modification and Stage 5 Functional Safety Assessment | Master | 2022-02-05 |
Pending
|
|
| Projects | Authored FSA 5 Bacardi, Westthorn, P-2510 | 2023-03-29 |
|
| 61511-FSA5 | Modification and Stage 5 Functional Safety Assessment | Master | 2022-02-05 |
Pending
|
|
| Carried out multiple FSA 5 | 2020-11-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| 61508-FSM | Functional Safety Management | Professional | 2022-02-05 |
Pending
|
|
| Projects | Preparation of Functional Safety Management Plans | 2020-11-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| HRA-LOPA | Layer of Protection Analysis | Professional | 2022-02-05 |
Pending
|
|
| Projects | Preparation of LOPA documentation | 2020-11-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Junior | 2022-02-05 |
Pending
|
|
| Projects | Attended multiple HazOp studies | 2020-11-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| ECI-CONTROL | Programming and control fundamentals | Master | 2022-02-10 |
Pending
|
|
| Projects | Hardware and software design of PLC automation. | 2020-01-01 |
|
| ECI-INST | Field devices - measurement principles and final elements | Master | 2022-02-10 |
Pending
|
|
| Projects | Specification, design and modification of instrumented control loops. | 2020-11-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-02-10 |
Pending
|
|
| Projects | Installation, commissioning and modification of PLC based and hardwired EC&I control systems. | 2022-02-09 |
|
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-02-10 |
Pending
|
|
| Installation, commissioning and modification of Safety Related PLC based and hardwired EC&I control systems to IEC61511. | 2020-11-01 |
|
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-02-10 |
Pending
|
|
| Following apprenticeship, worked for approximately 18 years as a multi-skilled technician with mechanical/electrical and instrumentation skillsets. Including commissioning, testing, modification and maintenance across a broad range of industrial applications, including diesel generators, standby and CHP generation sets, diesel engines, assembly machinery and of various measurement instrumentation. | 2000-01-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2022-02-05 |
Pending
|
|
| Examination / Qualification | CEng - IET | 2019-10-24 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2022-02-05 |
Pending
|
|
| University of Derby - MSc Professional Engineering | 2018-09-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2022-02-05 |
Pending
|
|
| Glyndwr University - BEng Industrial Engineering | 2014-10-31 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2022-02-05 |
Pending
|
|
| Stockport College - HNC Engineering (Electrical / Electronic) | 1996-12-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2022-02-05 |
Pending
|
|
| Stockport College of Technology - HNC Mechanical and Production Engineering | 1989-06-01 |
|