61511

Task Level of
Competency
Date Verification
Status
61511-FSM | Functional Safety Management Professional 2022-01-23
Verified
Pending
Initial Assessment 
Examination / Qualification Attended =Method TUV Sud certified 61511 training course May 2014. More information   2014-05-01
Approved
Not Verified
Unable to Verify

ECI

Task Level of
Competency
Date Verification
Status
ECI-CONTROL | Programming and control fundamentals Master 2022-01-23
Verified
Pending
Initial Assessment 
Projects Delivered projects included engineered systems for clients from metal refining, power generation, marine navigation, industrial waste treatment, and OEM sectors. Platforms utilised include Omron CX-One and Sysmac, Allen Bradley Studio5000, Siemens TIA, Wonderware InTouch, (Terminal) Remote Desktop Services, Fibre or Wired and Wireless architectures, Motion Control, FieldBus devices and analogue instrumentation.   2022-01-01
Approved
Not Verified
Unable to Verify
ECI-CONTROL | Programming and control fundamentals Master 2022-01-23
Verified
Pending
Initial Assessment 
Working on new capital investment projects, system upgrades and plant modifications. Responsibilities and duties included; • Preparing budgets and tender documentation for the C&I element of projects • Designing control system network architecture • Writing FDS, PLC code, SCADA software and control panel design from URS and HazOp studies • FAT testing of 3rd party control panels, PLC and SCADA software • Project Lead role in controlling delegated and sub-contracted elements of the project C&I operations department • Providing training to production and maintenance personnel   2007-03-01
Approved
Not Verified
Unable to Verify
ECI-INST | Field devices - measurement principles and final elements Master 2022-11-02
Verified
Pending
Initial Assessment 
Projects Working on new capital investment projects, system upgrades and plant modifications. Responsibilities and duties included; • Preparing budgets and tender documentation for the C&I element of projects • Instrument specification, procurement and installation • FAT testing of 3rd party control panels, PLC and SCADA software • Project Lead role in controlling delegated and sub-contracted elements of the project • Produce ‘as-built’ project documentation, panel drawings, instrument datasheets, critical spares lists etc. for C&I operations department • Providing training to production and maintenance personnelMore information   2007-03-01
Approved
Not Verified
Unable to Verify

TECH

Task Level of
Competency
Date Verification
Status
TECH-TRADESKILLS | Tech Trade Skills Professional 2022-11-02
Verified
Pending
Initial Assessment 
Projects Based at Mogden Sewage Treatment Works (STW), working on remote pumping stations in and around West London maintaining, installing and commissioning pump control equipment and telemetry systems. Then moved on to become the ICA Technician at the Hogsmill STW, Kingston-upon-Thames, responsible for maintaining all site instrumentation and control equipment, and also provided rota callout cover for South and West London.More information   2000-11-01
Approved
Not Verified
Unable to Verify
TECH-TRADESKILLS | Tech Trade Skills Professional 2022-11-02
Verified
Pending
Initial Assessment 
Providing instrumentation technical support on the commissioning of a pharmaceutical water purification plant. Responsibilities and duties included; • Performing loop checks • Commissioning field devices • Installing instrument piping and air supplies • Simulating process conditions for software testing • Inspection and Testing of electrical panels, carrying out modifications, producing as built technical drawingsMore information   1999-03-01
Approved
Not Verified
Unable to Verify
TECH-TRADESKILLS | Tech Trade Skills Professional 2022-11-02
Verified
Pending
Initial Assessment 
Working on sites across the North of England on turbines, CHP engines and polymer processing plants, Duties included performing instrument loop checks back to DCS and PLC systems, calibrating instruments and installing field equipment.More information   1998-11-01
Approved
Not Verified
Unable to Verify
TECH-TRADESKILLS | Tech Trade Skills Professional 2022-11-02
Verified
Pending
Initial Assessment 
As a member of the plant core maintenance team, I was responsible for performing the planned trip and alarm testing, rectifying the everyday equipment breakdowns and keeping the plant maintained to a continuous high standard. Duties also included the modification of control loops and working with manufacturers site engineers.More information   1998-06-01
Approved
Not Verified
Unable to Verify
TECH-TRADESKILLS | Tech Trade Skills Professional 2022-11-02
Verified
Pending
Initial Assessment 
Working on the construction and commissioning of a polymer plant. Responsible for the testing, inspection and documentation of instrument installations before handover to the client. More information   1997-12-01
Approved
Not Verified
Unable to Verify
TECH-TRADESKILLS | Tech Trade Skills Professional 2022-11-02
Verified
Pending
Initial Assessment 
Working on the construction of a Greenfield site oil refinery with a 10 million-ton per annum capacity. Responsibilities included the calibration and checking of approximately 5000 instruments before their installation in the field, completing all associated QC documentation and also inspecting work carried out by sub-contractors.More information   1997-08-01
Approved
Not Verified
Unable to Verify
TECH-PROOFTEST | Tech Prooftest Master 2022-11-02
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2842. Proof testing spray dryer SIFs. Carried out proof testa and authored summary report.More information   2022-10-01
Approved
Not Verified
Unable to Verify
TECH-PROOFTEST | Tech Prooftest Master 2022-11-02
Verified
Pending
Initial Assessment 
P-2716. Proof testing of Spray Dryer SIF. Carried out testing and authored summary report.More information   2022-03-01
Approved
Not Verified
Unable to Verify

GENERAL

Task Level of
Competency
Date Verification
Status
GENERAL | Activities Relevant to multiple tasks Pending Review 2022-01-26
Verified
Pending
Initial Assessment 
Examination / Qualification University of Teesside - HND Control and Instrumentation Engineering   1996-01-01
Approved
Not Verified
Unable to Verify