This page is the public summary of the =Method account holder named above, showing the Tasks for which competency has been assessed and the associated status. Further detail on the Competency Register may be found at www.methodcompreg.com.
The =Method Competency register is based on the following key principles
* The Competency Register recognises that it is sometimes clear at interview that an account holder should be awarded a particular Task status, but it is not possible for them to provide evidence of projects completed with previous employers. This position is recognised by the
symbol – which indicates that the account holder needs to complete 4 peer reviewed projects which will be subject to additional scrutiny.
close popup
To access this account please enter the password below. this password will be available from Bryan only.
| Task | Level of Competency |
Date | Verification Status |
| 61511-FSM | Functional Safety Management | Professional | 2022-01-23 |
Pending
|
|
| Examination / Qualification |
Attended =Method TUV Sud certified 61511 training course May 2014. |
2014-05-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| ECI-CONTROL | Programming and control fundamentals | Master | 2022-01-23 |
Pending
|
|
| Projects | Delivered projects included engineered systems for clients from metal refining, power generation, marine navigation, industrial waste treatment, and OEM sectors. Platforms utilised include Omron CX-One and Sysmac, Allen Bradley Studio5000, Siemens TIA, Wonderware InTouch, (Terminal) Remote Desktop Services, Fibre or Wired and Wireless architectures, Motion Control, FieldBus devices and analogue instrumentation. | 2022-01-01 |
|
| ECI-CONTROL | Programming and control fundamentals | Master | 2022-01-23 |
Pending
|
|
| Working on new capital investment projects, system upgrades and plant modifications. Responsibilities and duties included; • Preparing budgets and tender documentation for the C&I element of projects • Designing control system network architecture • Writing FDS, PLC code, SCADA software and control panel design from URS and HazOp studies • FAT testing of 3rd party control panels, PLC and SCADA software • Project Lead role in controlling delegated and sub-contracted elements of the project C&I operations department • Providing training to production and maintenance personnel | 2007-03-01 |
|
| ECI-INST | Field devices - measurement principles and final elements | Master | 2022-11-02 |
Pending
|
|
| Task | Level of Competency |
Date | Verification Status |
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-11-02 |
Pending
|
|
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-11-02 |
Pending
|
|
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-11-02 |
Pending
|
|
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-11-02 |
Pending
|
|
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-11-02 |
Pending
|
|
|
Working on the construction and commissioning of a polymer plant. Responsible for the testing, inspection and documentation of instrument installations before handover to the client.
|
1997-12-01 |
|
| TECH-TRADESKILLS | Tech Trade Skills | Professional | 2022-11-02 |
Pending
|
|
| TECH-PROOFTEST | Tech Prooftest | Master | 2022-11-02 |
Pending
|
|
| Peer Reviewed Project |
P-2842. Proof testing spray dryer SIFs. Carried out proof testa and authored summary report. |
2022-10-01 |
|
| TECH-PROOFTEST | Tech Prooftest | Master | 2022-11-02 |
Pending
|
|
|
P-2716. Proof testing of Spray Dryer SIF. Carried out testing and authored summary report. |
2022-03-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2022-01-26 |
Pending
|
|
| Examination / Qualification | University of Teesside - HND Control and Instrumentation Engineering | 1996-01-01 |
|