=Method Group
More information about this page | Visit www.methodcompreg.com
This page is the public summary of the =Method account holder named above, showing the Tasks for which competency has been assessed and the associated status. Further detail on the Competency Register may be found at www.methodcompreg.com.
The =Method Competency register is based on the following key principles
* The Competency Register recognises that it is sometimes clear at interview that an account holder should be awarded a particular Task status, but it is not possible for them to provide evidence of projects completed with previous employers. This position is recognised by the
symbol – which indicates that the account holder needs to complete 4 peer reviewed projects which will be subject to additional scrutiny.
close popup
To access this account please enter the password below. this password will be available from Ray only.
| Task | Level of Competency |
Date | Verification Status |
| 61511-FSM | Functional Safety Management | Master | 2021-03-24 |
Pending
|
|
| Peer Reviewed Project |
P-2835. Project safety plan for offshore gas platform upgrade. (Safety plan covered entire project scope, including work by =Method). Author of plan. |
2022-11-01 |
|
| 61511-FSM | Functional Safety Management | Master | 2021-03-24 |
Pending
|
|
| Projects |
Broad industry experience of FSM |
2021-03-01 |
|
| 61511-SRS | Safety Requirement Specification | Professional | 2021-11-14 |
Pending
|
|
| Projects | Ray wrote a SRS for an overspeed trip system relating to four gas generators (simple cycle gas turbines) and associated power turbine / generator sets. Final actuation involved dissimilar redundant channels with differing SIF response times thus the overall effect was to provide SIL 3 overspeed protection against a loss of containment event and SIL 2 overspeed protection against blade loss. | 2020-01-07 |
|
| 61511-FSA1 | Stage 1 Functional Safety Assessment | Master | 2021-12-21 |
Pending
|
|
| Projects | Ray has broad experience of the lifecycle phases covered by the scope of FSA 1 and has delivered a number of assessments in the power industries. | 2021-12-21 |
|
| 61511-DES S/W | Clause 12 - SIS Application Program Development | Master | 2021-04-08 |
Pending
|
|
| Peer Reviewed Project |
P-2735. Front-End Engineering Design for SIFs on Tanker Bay application. Checker of report. |
2022-05-30 |
|
| 61511-DES S/W | Clause 12 - SIS Application Program Development | Master | 2021-04-08 |
Pending
|
|
| Projects |
Open for new project |
2021-03-08 |
|
| 61511-SILV&C | SIL Verification and Calculation | Professional | 2021-11-14 |
Pending
|
|
| Peer Reviewed Project | Confirming compliance with 61508/61511 for a number of devices intended for use on an offshore gas platform. Author of checklists. | 2023-02-20 |
|
| 61511-SILV&C | SIL Verification and Calculation | Professional | 2021-11-14 |
Pending
|
|
| Projects | Ray carried out SIL Verification and Calculations for an overspeed trip system relating to four gas generators (simple cycle gas turbines) and associated power turbine / generator sets. Final actuation involved dissimilar redundant channels with differing SIF response times thus the overall effect was to provide SIL 3 overspeed protection against a loss of containment event and SIL 2 overspeed protection against blade loss. | 2020-04-04 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Professional | 2021-11-14 |
Pending
|
|
| Projects | Ray was a member of a Stage 3 FSA team (representing the C&I and FS disciplines) on a Gas Fired Power Station. On this particular project, there had been no FSA1 or FSA2. The work involved consideration and tracing of scenarios from Hazid, though Hazop, LOPA, SRS, Design and verification calcs, validation, operation and maintenance procedures (including proof testing). | 2009-07-20 |
|
| Task | Level of Competency |
Date | Verification Status |
| HRA-FTA | Fault Tree Analysis | Pending Review | 2022-07-18 |
Pending
|
|
| Peer Reviewed Project | P-6139m. Risk assessment of Burner Management System using Fault Tree Analysis. | 2022-06-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Pending Review | 2022-09-08 |
Pending
|
|
| Projects | Placeholder | 2022-08-18 |
|
| Task | Level of Competency |
Date | Verification Status |
| PS-ERGONOMICS | Control Room Ergonomics | Professional | 2021-04-08 |
Pending
|
|
| Projects |
Added to support new project |
2021-03-08 |
|
| Task | Level of Competency |
Date | Verification Status |
| ALARM-PSD | Philosophy, Spec and Design | Master | 2021-04-08 |
Pending
|
|
| ALARM-PSD | Philosophy, Spec and Design | Master | 2021-04-08 |
Pending
|
|
| Projects |
Added to support new project |
2021-03-08 |
|
| ALARM-PSD | Philosophy, Spec and Design | Master | 2021-04-08 |
Pending
|
|
| ALARM-IR | Implement & Rationalise | Professional | 2021-04-08 |
Pending
|
|
| Projects |
Added to support new project |
2021-03-08 |
|
| ALARM-ROMT | Response, O&M & Test | Professional | 2021-04-08 |
Pending
|
|
| Projects |
Added to support new project |
2021-03-08 |
|
| Task | Level of Competency |
Date | Verification Status |
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
| Examination / Qualification |
TUV Rheinland FS Engineer 3837/11 (Expires July 2021) |
2016-07-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
TUV Rheinland Process Hazard and Risk Analysis (PH&RA) 11941/16 (Expires January 2021) |
2016-02-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
DfES Qualified Teacher of Mathematics |
2002-08-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
University of Bath Postgraduate Certificate in Education |
2002-07-03 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
FEANI EUR ING (European Engineer) |
1989-10-03 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
CEng with IET |
1989-09-19 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
University of Sheffield BEng Control Engineering |
1983-07-16 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
| General Training (exam) |
RWE CCGT Operations (4 day) |
2016-02-25 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
citi Making Projects Work (3 day) |
2012-04-26 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
Baseefa ATEX/DSEAR (2 day course) |
2011-11-17 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
| General Training (no exam) |
IET IEC-61508 Safety Critical Systems (5 day) |
2009-03-20 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
Systems & Network Training TCP/IP (5 day) |
2006-09-15 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
| Task Relevant Training (exam) |
RWE Managing Safely |
2013-11-08 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
ABB IEC 61511 Process Hazard and Risk Assessment (5 day) |
2010-05-21 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
RWE Risk Assessment Training (1 day) |
2009-11-17 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
ABB IEC 61508/11 SIL Determination (3 day) |
2009-09-10 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2021-04-08 |
Pending
|
|
|
LRQA Internal QMS Auditor (2 day) |
2006-12-07 |
|