Verified Competency Register for Simon Sheehan

=Method Group

More information about this page | Visit www.methodcompreg.com

Login to view account

To access this account please enter the password below. this password will be available from Simon only.


61511

Task Level of
Competency
Date Verification
Status
61511-FSM | Functional Safety Management Master 2021-01-15
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2515. A formal Functional Safety Audit to assess compliance against BS EN 61511-1. Carry out an efficiency review and provide suggestions for improvement to the procedures as required, prior to the formal review process commencing. Joint author /verifier.More information   2021-06-24
Approved
Not Verified
Unable to Verify
61511-FSM | Functional Safety Management Master 2021-01-15
Verified
Pending
Initial Assessment 
P-2571. Authoring Functional Safety Policy statement and Functional Safety Procedures. Author - FSM procedures.More information   2021-04-30
Approved
Not Verified
Unable to Verify
61511-FSM | Functional Safety Management Master 2021-01-15
Verified
Pending
Initial Assessment 
Projects Providing general support to a client project for gas storage - assistance to author project Safety plan, SRS and verifying PFD calculations using aeShield.More information   2023-03-01
Approved
Not Verified
Unable to Verify
61511-FSM | Functional Safety Management Master 2021-01-15
Verified
Pending
Initial Assessment 
P-2622m. Assist with preparation for HSE intervention and attend HSE MeetingsMore information   2021-05-27
Approved
Not Verified
Unable to Verify
61511-FSM | Functional Safety Management Master 2021-01-15
Verified
Pending
Initial Assessment 
As TA of Petronineos responsible for FSM, Simon has much "practical" experience of FSM - as audited by the HSE. Simon has also demonstrated solid understanding of detailed requirements during initial assessment of FSM procedures for steel industry client (P-2515). This project is not yet complete and has not been subject to formal review, but sufficient evidence to award MST status as initial assessment.More information   2020-12-24
Approved
Not Verified
Unable to Verify
61511-SRS | Safety Requirement Specification Master 2021-11-14
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2704. Review of SRS client template. Author of Checklist.   2022-10-01
Approved
Not Verified
Unable to Verify
61511-SRS | Safety Requirement Specification Master 2021-11-14
Verified
Pending
Initial Assessment 
Projects As technical authority for Petroineos UK and also Functional Safety Engineer, Simon has written a number of SRS documents for both new installations and modification works. Also, as part of work as SIS projects engineer at Petroineos Simon has reviewed and approved SRS’s written by others. Simon also helped develop the SRS template for Petroineos as part of the GMP 21 site Standard update in 2015 and 2020.   2021-10-26
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Professional 2021-02-12
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2530. FSA 1 of drinks industry storage and tanker loading HazOp and LOPA. Report checkerMore information   2021-01-01
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Professional 2021-02-12
Verified
Pending
Initial Assessment 
P-2572. FSA 1 of steel industry continuous annealing process line HazOp and LOPA. Report Checker.More information   2021-01-01
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Professional 2021-02-12
Verified
Pending
Initial Assessment 
Projects As Technical Authority for Petroineos UK, various projectsMore information   2021-02-10
Approved
Not Verified
Unable to Verify
61511-DES H/W | Clause 11 - SIS Design and Engineering Master 2021-01-24
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2735. Front-End Engineering Design for SIFs on Tanker Bay application. Co-author of report.More information   2022-05-31
Approved
Not Verified
Unable to Verify
61511-DES H/W | Clause 11 - SIS Design and Engineering Master 2021-01-24
Verified
Pending
Initial Assessment 
P-2545. Writing procedures to manage installation, commissioning and validation of control and instrumentation (including that for Safety Instrumented Systems). Report AuthorMore information   2021-03-04
Approved
Not Verified
Unable to Verify
61511-DES H/W | Clause 11 - SIS Design and Engineering Master 2021-01-24
Verified
Pending
Initial Assessment 
P-2556. Reviewing conceptual SIS design prior to publication of Safety Requirement Specification. Reviewing conceptual SIS design prior to publication of Safety Requirement Specification. Confirming architecture and estimating PFD prior to prove concept. Report Author.More information   2021-02-12
Approved
Not Verified
Unable to Verify
61511-DES H/W | Clause 11 - SIS Design and Engineering Master 2021-01-24
Verified
Pending
Initial Assessment 
Projects Experience as TA of PetroineosMore information   2021-01-21
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2022-02-10
Verified
Pending
Initial Assessment 
Peer Reviewed Project Confirming compliance with 61508/61511 for a number of devices intended for use on an offshore gas platform. Verifier of report.   2023-02-20
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2022-02-10
Verified
Pending
Initial Assessment 
Projects As technical authority for Petroineos UK and also Functional Safety Engineer, Simon has been responsible for the selection of equipment for use in SIS applications. This has either been directly for his own projects, or via approval of other engineers design work. During his work in Aberdeen with C&I Engineering, Simon was the lead for carrying out SIL calculations using the exSILentia tool, reviewing the suitability of equipment and ensuring that the actual maintenance regimes in place reflect the assumptions made in the calculations.   2021-10-26
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2022-02-10
Verified
Pending
Initial Assessment 
P-2483.015. Review of SIF component compliance. Author of report   2021-09-01
Approved
Not Verified
Unable to Verify
61511-FAT/SAT | Clauses 13 / 15 - Factory Acceptance Test / SIS Safety Validation Master 2021-05-09
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2545m. Developing procedures for BPCS installation, commissioning and validation. Author of procedures.More information   2021-06-25
Approved
Not Verified
Unable to Verify
61511-FAT/SAT | Clauses 13 / 15 - Factory Acceptance Test / SIS Safety Validation Master 2021-05-09
Verified
Pending
Initial Assessment 
Projects Simon has written specific validation and revalidation procedures for new and modified SIFs up to SIL3 over several projects across Petroineos Refinery. Simon also developed hardware validation processes for validating hardware and software for modifications for live, online logic solvers where traditional testing could not be carried out, specifically to ensure that unmodified parts of the installation had not been inadvertently affected. In 2019 Simon wrote a new test & commissioning standard for all Petroineos UK sites following BS EN 62381-2012 More information   2021-01-12
Approved
Not Verified
Unable to Verify
61511-FSA2 | Stage 2 Functional Safety Assessment Master 2021-11-14
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2832. FSA 2 of offshore gas platform. Joint author of report (FSM and SSL checklists).More information   2023-02-20
Approved
Not Verified
Unable to Verify
61511-FSA2 | Stage 2 Functional Safety Assessment Master 2021-11-14
Verified
Pending
Initial Assessment 
P-2767. P-2767. FSA 2 (part of FSA 1-3) of Chlorine Manufacturer site. Author of hardware related checklists and Checker of software related checklists.More information   2022-08-26
Approved
Not Verified
Unable to Verify
61511-FSA2 | Stage 2 Functional Safety Assessment Master 2021-11-14
Verified
Pending
Initial Assessment 
Development of FSA 2 checklists at PetroineosMore information   2021-01-12
Approved
Not Verified
Unable to Verify
61511-FSA2 | Stage 2 Functional Safety Assessment Master 2021-11-14
Verified
Pending
Initial Assessment 
Projects Multiple FSA 2 at PetroineosMore information   2021-02-17
Approved
Not Verified
Unable to Verify
61511-INSTALL | Clause 14 SIS Installation and Commissioning Master 2021-05-09
Verified
Pending
Initial Assessment 
Projects Simon has led installation and commissioning on a number of complex projects involving modifying online logic solvers and complex intertrip systems and live cut overs, all on systems protecting running plant More information   2021-01-12
Approved
Not Verified
Unable to Verify
61511-FSA3 | Stage 3 Functional Safety Assessment Master 2023-04-12
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2741. FSA 3 of LNG application. Author of reportMore information   2023-03-24
Approved
Not Verified
Unable to Verify
61511-FSA3 | Stage 3 Functional Safety Assessment Master 2023-04-12
Verified
Pending
Initial Assessment 
P-2767. FSA 3 (part of FSA 1-3) of Chlorine Manufacturer site. Author of checklists.More information   2022-08-26
Approved
Not Verified
Unable to Verify
61511-FSA3 | Stage 3 Functional Safety Assessment Master 2023-04-12
Verified
Pending
Initial Assessment 
P-2795. FSA 3 of Blythe Platform SIS Modification. Author of Checklists and Summary Report.More information   2022-08-04
Approved
Not Verified
Unable to Verify
61511-FSA3 | Stage 3 Functional Safety Assessment Master 2023-04-12
Verified
Pending
Initial Assessment 
P-2649. FSA 3 of chemical plant expansion (included review of scope of FSA 1 &2). Joint author / checker of various checklists.More information   2022-02-15
Approved
Not Verified
Unable to Verify
61511-FSA3 | Stage 3 Functional Safety Assessment Master 2023-04-12
Verified
Pending
Initial Assessment 
Projects As technical authority for Petroineos UK and also Functional Safety Engineer. Simon has carried out and assisted with many FSA stage 3 assessments. These were generally large projects, deemed too complex for FSA5, mainly logic solver replacement project and Buncefield tank remediation works. Simon has also assisted external consultants to carry out FSA3 on similar projects, and was responsible for accepting and closing actions against FSA3 carried out by others. More information   2021-10-25
Approved
Not Verified
Unable to Verify
61511-FSA3 | Stage 3 Functional Safety Assessment Master 2023-04-12
Verified
Pending
Initial Assessment 
Simon has also verified and approved multiple FSA3 produced by EPC’s and SI’s for Petroineos, Incorporating both software and hardware, and managed the close out of actions resulting from these FSA3s. Simon has trained and coached others to carry out FSA3 for Petroineos. Simon also assisted with generation of Petroineos’s FSA3 checklists, and verification checklists. In other roles, Simon has carried out FSA3s for North Sea and onshore oil and gas operators. More information   2021-02-17
Approved
Not Verified
Unable to Verify
61511-O&M | Clause 16 SIS Operations and Maintenance Master 2021-05-09
Verified
Pending
Initial Assessment 
Projects Simon put in place increased KPI measurement for SIF performance, including measuring actual MTTR. Simon was trained in Kelvin TOPSET root cause analysis methods, and led investigations into SIF failures. During his time as an asset engineer, Simon was the SIS Owner for ~1/3 of Grangemouth refinery covering 9 logic solvers with ~2500 I/O covering ~100 SIFs. As SIS Engineer Simon was the Logic Solver systems engineer for all Petroineos UK sites, specialising in Honeywell FSC systems, managing all maintenance and modification on those systems and developing a risk management system to reduce the likelihood of trip due to maintenance activities, on both logic solvers and field equipment. Simon worked with operations and maintenance teams to ensure functional safety competency and awareness at all levels. Simon also reviewed the physical security of all the SIFs, managing passwords and key access tof both panels and override systems. Simon developed a new FSA4 process based on CDOIF legacy systems guidance for the site, to effectively ensure legacy systems compliance through the FSA4 process. Simon was also an auditor for EC&I for ISO9001 compliance. More information   2021-02-23
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2609E. FSA 4 of steel industry sinter plant. Report Author.More information   2022-03-19
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
P-2609D. FSA 4 of steel granular coal injection plant. Report Author.More information   2022-03-17
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
P-2609C. FSA 4 of steel industry blast furnace. Report Author.More information   2021-10-28
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
P-2661. FSA 4 of pharmaceutical tank farm. Report Author.More information   2021-10-13
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
P-2579. FSA 4 of industrial chemicals (chlor-alkali) plant. Report AuthorMore information   2021-07-31
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
P-2609A. FSA 4 of steel industry blast furnace. Report Verifier.More information   2021-06-24
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
P-2634. FSA 4 of pharma industry tank farm. Report Verifier.More information   2021-06-22
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
P-2552. FSA 4 of steel industry continuous annealing plant. Report Verifier.More information   2021-05-18
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Master 2021-02-24
Verified
Pending
Initial Assessment 
Projects Simon has carried many FSA4’s either on new SIFs, 18 months after commissioning or SIFs installed earlier to IEC61511 standards, and on legacy systems up to SIL3. More information   2021-02-17
Approved
Not Verified
Unable to Verify
61511-FSA5 | Modification and Stage 5 Functional Safety Assessment Master 2022-02-10
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2483.S012. FSA 5 of chemical plant installation of new SIF instrumentation. Author of report.   2022-02-10
Approved
Not Verified
Unable to Verify
61511-FSA5 | Modification and Stage 5 Functional Safety Assessment Master 2022-02-10
Verified
Pending
Initial Assessment 
Projects As Technical Authority for Petroineos and SIS Engineer, Simon has carried a large amount of FSA5’s on a wide and varied series of scopes, mainly on minor modifications to existing SIFs up to SIL3, which included software and hardware modifications. FSA5 was also carried out on destruct work on legacy SIL3 systems. Simon also assisted with generation of Petroineos’s FSA5 checklists, and verification checklists. Simon has trained and coached others to carry out FSA5 for Petroineos. In other roles, Simon has carried out FSA5s for North Sea and onshore oil and gas operators.   2021-02-17
Approved
Not Verified
Unable to Verify

ECI

Task Level of
Competency
Date Verification
Status
ECI-CONTROL | Programming and control fundamentals Master 2022-02-10
Verified
Pending
Initial Assessment 
Projects New Task for project   2021-09-08
Approved
Not Verified
Unable to Verify
ECI-INST | Field devices - measurement principles and final elements Master 2022-02-10
Verified
Pending
Initial Assessment 
Projects P-2627/2640. Initial review, then writing the EC&I section of the Site Safety Report prior to submission to the HSE. Author of report.   2021-10-14
Approved
Not Verified
Unable to Verify
ECI-INST | Field devices - measurement principles and final elements Master 2022-02-10
Verified
Pending
Initial Assessment 
New task for project   2021-09-08
Approved
Not Verified
Unable to Verify
ECI-LVELEC | Electrical devices and systems <1kV Pending Review 2021-09-08
Verified
Pending
Initial Assessment 
Projects New task for project   2021-09-08
Approved
Not Verified
Unable to Verify
ECI-HVELEC | Electrical devices and systems >1kV Pending Review 2021-09-08
Verified
Pending
Initial Assessment 
Projects New task for project   2021-09-08
Approved
Not Verified
Unable to Verify
ECI-ATEX | ATEX instrumentation Master 2022-02-10
Verified
Pending
Initial Assessment 
Projects New task for project   2021-09-08
Approved
Not Verified
Unable to Verify

ALARMS

Task Level of
Competency
Date Verification
Status
ALARM-PSD | Philosophy, Spec and Design Master 2020-12-22
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2532. To put in place a Management Process for Alarm Management, carry out an alarm review of all alarms at two sites and to produce an alarm response manual for use in the control room by the operations staff. eport Author.   2021-05-03
Approved
Not Verified
Unable to Verify
ALARM-PSD | Philosophy, Spec and Design Master 2020-12-22
Verified
Pending
Initial Assessment 
Projects Writing procedures was a significant part of the TA role at Petroineos, though procedures for alarm philosophy specifically were not developed, specification and design of alarms was carried out for ~ 15 projects. Typically of between 1 to 20 alarms (higher alarm counts carried out by capital projects - which would often be reviewed by SS).   2020-12-22
Approved
Not Verified
Unable to Verify
ALARM-IR | Implement & Rationalise Master 2020-12-22
Verified
Pending
Initial Assessment 
Projects As TA of Petronineos, was involved (peripherally) with monthly alarm rationalisation review, but was often actioned to investigate many alarm implementations to deter mine if rationalisation was possible. And was involved in designing approach to dynamic alarm handling.   2020-12-20
Approved
Not Verified
Unable to Verify
ALARM-ROMT | Response, O&M & Test Master 2020-12-22
Verified
Pending
Initial Assessment 
Projects Wrote many test procedures (which included non-SIL alarms), wrote many ARM's and many investigations in to root cause of alarm being set. (Prior to TA role, ~10 years of asset management, which required involvement in alarm response, O&M and test).   2020-12-20
Approved
Not Verified
Unable to Verify

GENERAL

Task Level of
Competency
Date Verification
Status
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
Examination / Qualification Registered as a Chartered Engineer with the Engineering Council. Registration number 545532   2019-11-14
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
Fellow of the InstMC. Previously an ordinary member since 2007. Membership number 19733.   2019-06-28
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
FSEng (TUV Rheinland) - Safety Instrumented Systems. Licence no 2518/10. 10-year renewal completed July 2020. Valid until September 2030   2010-05-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
Postgraduate Diploma with Distinction - Mechatronics from Edinburgh Napier University   2009-11-12
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
BEng - Electrical & Electronic Engineering from Edinburgh Napier University. First Class with Honours   2005-11-17
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
HNC Electrical Engineering with Measurement & Control from SCOTVEC/Fourth Valley College   1995-06-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
NC Electrical Engineering from SCOTVEC/Fourth Valley College   1993-06-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
General Training (exam) CompEx 14 - Responsible Persons from JTL/Forth Valley College. Valid until 24 November 2021   2016-11-24
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
General Training (no exam) Kelvin TOPSET 1-day investigator training course, for root cause analysis/incident investigation   2019-02-21
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
Hazard Study Awareness course delivered by ABB   2015-09-24
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
Honeywell FSC-4505 - FSC Safety Systems Maintenance Fundamentals   2013-05-16
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
Industry Roles / Recognition Chairman of the East of Scotland Local Section of the InstMC from 2014 until 2017. I was also a member of the local committee from 2008 until 2018.   2014-10-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review
Verified
Pending
Initial Assessment 
Projects Appointed as Instrument & Electrical Technical Authority for all Petroineos UK sites (Grangemouth Refinery, Finnart Ocean Terminal & Dalston Terminal). Specifically responsible for ATEX/DSEAR, Electrical Safety, Functional Safety (shared with other TA). I was in this role from March 2015 until April 2020.   2015-03-04
Approved
Not Verified
Unable to Verify