=Method Group
More information about this page | Visit www.methodcompreg.com
This page is the public summary of the =Method account holder named above, showing the Tasks for which competency has been assessed and the associated status. Further detail on the Competency Register may be found at www.methodcompreg.com.
The =Method Competency register is based on the following key principles
* The Competency Register recognises that it is sometimes clear at interview that an account holder should be awarded a particular Task status, but it is not possible for them to provide evidence of projects completed with previous employers. This position is recognised by the
symbol – which indicates that the account holder needs to complete 4 peer reviewed projects which will be subject to additional scrutiny.
close popup
To access this account please enter the password below. this password will be available from Andrew only.
| Task | Level of Competency |
Date | Verification Status |
| 61511-FSM | Functional Safety Management | Professional | 2020-08-28 |
Pending
|
|
| Projects |
P-6052 Author of Terms of reference, Facilitator of HS1 study, author of study report. |
2020-09-20 |
|
| 61511-FSM | Functional Safety Management | Professional | 2020-08-28 |
Pending
|
|
|
Involvement in many projects requiring compliance with 61511 FSM requirements. |
2020-08-28 |
|
| 61511-SRS | Safety Requirement Specification | Master | 2021-01-14 |
Pending
|
|
| Peer Reviewed Project |
Generation of template SRS for engineering contractor. Informally reviewed by DW, but sufficient to be credited with Knowledge | Peer Reviewed Project. |
2019-01-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
| Deliver Training / Present Paper |
LOPA Training Course (LSE1907) |
2019-07-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
Developed and delivered beta of Layer of Protection Analysis training course. Very succesful course, changes required but a very good beta test. Confirmed MST status |
2018-10-17 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
| Peer Reviewed Project |
P-6083. Layer of Protection Analysis of steel plant annealing process. Author. |
2021-10-25 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6069. Layer of Protection Analysis (LOPA) study on steel plant continuous annealing process. Author. |
2021-06-24 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6065. Facilitate, document and verify Hazard and Operability (HazOp) and Layer of Protection Analysis (LOPA) studies for drinks industry storage vats and road tanker loading. Author. |
2021-02-09 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6096. Delivery of HazOp and LOPA study of Thermal Oxidiser for food and beverage (oil seed) producer. LOPA verifier. |
2021-01-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6040. Review and update of earlier LOPA on tank storage site. Checker of report. |
2020-04-24 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6025. LOPA of foam manufacturing process. Checker of report. |
2020-03-09 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6014. LOPA of proposals to re-instante pipeline to tank storage facility. Author of report. |
2019-10-30 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6014 Author of Terms of Reference and study leader for HazOp Study of Tank Storage Application. Subject to subsequent review by HSE.
|
2019-10-25 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6006. LOPA of water utility aqueduct. Author of report. |
2019-08-13 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-6009. LOPA of explosives production processes. Author of report. |
2019-08-12 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-2241. HazOp of pharmaceutical mixing system. Author of report. |
2018-10-25 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-2241. LOPA of pharmaceutical mixing system. Author of report. |
2018-10-25 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-2166. LOPA of acid storage facility. Author of report. |
2018-04-09 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
| Projects |
P-2143B. LOPA of oil terminal and storage facility. Author of report. Paused project, not promoted to Knowledge. |
2018-09-26 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
P-2161. Review of LOPA for wood pellet conversion of previously coal fired power station. No formal project report, so not promoted to Knowledge. |
2017-12-15 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2017/04. LOPA facilitator & scribe - Power generation project. No evidence of peer review, so not promoted to Knowledge. |
2017-04-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2017/01. LOPA facilitator - Water and waste project. No evidence of peer review, so not promoted to Knowledge. |
2017-01-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2016/10. LOPA facilitator & scribe - Power generation project. No evidence of peer review, so not promoted to Knowledge. |
2016-10-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2016/03. LOPA facilitator - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2016-03-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2016/02. LOPA facilitator - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2016-02-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2015/06. LOPA facilitator - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2015-06-09 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2015/04. LOPA facilitator - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2015-04-15 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2015/03. LOPA facilitator - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2015-03-24 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2015/03. LOPA facilitator - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2015-03-12 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2014/07. LOPA team member - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2014-07-17 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2014/01. LOPA facilitator - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2014-01-29 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2014/01. LOPA facilitator - Pharma project. No evidence of peer review, so not promoted to Knowledge. |
2014-01-27 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2013/01. LOPA facilitator - Downstream gas project. No evidence of peer review, so not promoted to Knowledge. |
2013-01-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
|
2013/01. LOPA facilitator - Gas fired heater. No evidence of peer review, so not promoted to Knowledge. |
2013-01-01 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-28 |
Pending
|
|
| Task Relevant Training (no exam) |
IChemE Layer of Protection Analysis (LOPA) |
2011-04-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
| Deliver Training / Present Paper |
Hazard Study Leader training course (co-presenter) - HSL2104 |
2021-04-26 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
Hazard Study Leader training course (co-presenter) - HSL2008 |
2020-08-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
Hazard Study Leader training course (co-presenter) - HSL2006 |
2020-06-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
| Peer Reviewed Project |
P-6143B. HazOp study of water and steam processes for a boiler. Author of report. |
2022-11-28 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-6092. Site-wide re-HazOp study, defining and then using “typicals” to reduce study time. Study Leader. |
2021-11-08 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-6053. HazOp of steel industry continuous annealing process line. Report verifier. |
2021-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-6062. HazOp of steel industry batch annealing process. Report verifier. |
2021-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-6013. HazOp of foam manufacturing operation. Verifier of report. |
2019-10-22 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-6015. HazOp of approach to re-starting explosives plant after fire. Checker of report. |
2019-09-19 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-6008. HazOp of explosives manufacturing process. Author of reports and checker of reports authored by others. |
2019-06-14 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-2235. Review of earlier LOPA for emulsion plant on explosives manufacturing site. Author of report. |
2019-04-25 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-2254. Review of earlier HazOp and updating report to capture changes. Author of report. |
2019-04-25 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-2127. HazOp of acid recovery plant for explosives manufacturer. Author of report. |
2018-04-12 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-2126. LOPA of acid storage facility for explosives manufacturing process. Author of report. |
2018-02-27 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-2109. HazOp of chlorine systems upgrade for precious metals recovery process. Author of report. |
2007-12-07 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
| Projects |
P-6016 HazOp Study of Mobile Explosives Mixing Units. Author of report. |
2020-08-17 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
P-2143A. HazOp of oil terminal and storage facility. Author of report. Paused project, not promoted to Knowldge. |
2018-09-26 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2016/08. HazOp facilitator - energy from waste (effluent) project. No evidence of peer review, so not promoted to Knowledge. |
2016-08-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2016/08. HazOp scribe - Water and waste project. No evidence of peer review, so not promoted to Knowledge. |
2016-08-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2016/08. HazOp scribe - Water and waste project. No evidence of peer review, so not promoted to Knowledge. |
2016-08-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2016/07. HazOp scribe - Water and waste project. No evidence of peer review, so not promoted to Knowledge. |
2016-07-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2016/07. HazOp scribe - Water and waste project. No evidence of peer review, so not promoted to Knowledge. |
2016-07-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2016/04. HazOp facilitator - Chemical industry. No evidence of peer review, so not promoted to Knowledge. |
2016-04-19 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2015/01 HazOp facilitator - pharma project. No evidence of peer review, so not promoted to Knowledge. |
2015-12-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2015/01. HazOp facilitator - pharma project. No evidence of peer review, so not promoted to Knowledge. |
2015-10-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2015/08. HazOp facilitator - pharma project. No evidence of peer review, so not promoted to Knowledge. |
2015-08-03 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2015/06. HazOp facilitator - pharma project. No evidence of peer review, so not promoted to Knowledge. |
2015-06-25 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2014/08. HazOp team member - Pharma process upgrade. No evidence of peer review, so not promoted to Knowledge. |
2014-08-04 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2014/03. HazOp team member - Pharma process upgrade. No evidence of peer review, so not promoted to Knowledge. |
2014-03-11 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2013/12. HazOp team member - Pharma process upgrade. No evidence of peer review, so not promoted to Knowledge. |
2013-12-17 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2013/11. HazOp scribe - Water and waste project. No evidence of peer review, so not promoted to Knowledge. |
2013-11-22 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2013/09. HazOp scribe - Water and waste project. No evidence of peer review, so not promoted to Knowledge. |
2013-09-12 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
HazOp facilitator - power generation project. No evidence of peer review, so not promoted to Knowledge. |
2013-06-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
HazOp facilitator - power generation project. No evidence of peer review, so not promoted to Knowledge. |
2013-03-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
HazOp facilitator - downstream gas project. Included CHazOp. No evidence of peer review, so not promoted to Knowledge. |
2013-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2013/01. HazOp team member - Gas fired heater. No evidence of peer review, so not promoted to Knowledge. |
2013-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
HazOp facilitator - gas compressor project. No evidence of peer review, so not promoted to Knowledge. |
2012-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2012/01. HazOp team member - Gas compressor. No evidence of peer review, so not promoted to Knowledge. |
2012-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2012/01. HazOp facilitator - Downstream gas project. No evidence of peer review, so not promoted to Knowledge. |
2012-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2012/01. HazOp facilitator - Downstream gas project. No evidence of peer review, so not promoted to Knowledge. |
2012-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2012/01. HazOp team member - Gas compressor. No evidence of peer review, so not promoted to Knowledge. |
2012-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
2012/01. HazOp team member - Downstream gas project. No evidence of peer review, so not promoted to Knowledge. |
2012-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
HazOp facilitator - downstream gas project. No evidence of peer review, so not promoted to Knowledge. |
2011-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
HazOp facilitator - oil refinery project. No evidence of peer review, so not promoted to Knowledge. |
2010-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
| Task Relevant Training (no exam) |
IChemE - HAZOP study for Team Leaders |
2008-11-21 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-28 |
Pending
|
|
|
IChemE - HAZOP study for team leaders |
2008-11-18 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-08-28 |
Pending
|
|
| Peer Reviewed Project |
P-6052 Author of Terms of reference, Facilitator of HS1 study, author of study report. |
2020-09-20 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-08-28 |
Pending
|
|
| Projects |
HS2 refrigerated gas supply project. |
2020-03-06 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-08-28 |
Pending
|
|
|
P-6040 Verifier of "Terms of Reference" for a Process Hazard Review of ink storage facility (project not taken through to completion - not peer reviewed). |
2020-02-27 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-08-28 |
Pending
|
|
|
HS2 of chemical industry expansion project. |
2020-01-17 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-08-28 |
Pending
|
|
|
HS2 (HAZID) of chemical industry project |
2019-12-12 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-08-28 |
Pending
|
|
|
HS2 (HAZID) study of chemical industry project |
2019-10-31 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-08-28 |
Pending
|
|
|
HS2 (HAZID) study of chemical industry project. |
2019-10-03 |
|
| HRA-HS0/1 | Inherent Safety and Initial Hazard Review | Master | 2020-08-28 |
Pending
|
|
| Projects |
P-6052 Author of Terms of reference, Facilitator of HS1 study, author of study report. |
2020-09-20 |
|
| HRA-HS0/1 | Inherent Safety and Initial Hazard Review | Master | 2020-08-28 |
Pending
|
|
|
HS1 Chemical industry site expansion project |
2020-01-17 |
|
| HRA-MEET | Hazard Study Meeting Management | Master | 2020-08-28 |
Pending
|
|
| Deliver Training / Present Paper |
Co-developed =Method Hazard Study Leadership training course. |
2020-06-01 |
|
| HRA-MEET | Hazard Study Meeting Management | Master | 2020-08-28 |
Pending
|
|
| Projects |
P-6052 Author of Terms of reference, Facilitator of HS1 study, author of study report. |
2020-09-20 |
|
| Task | Level of Competency |
Date | Verification Status |
| PS-HAZARD | Process Hazard Knowledge | Master | 2020-08-28 |
Pending
|
|
| Deliver Training / Present Paper |
Andrew co-developed and is a trainer for =Method Hazard Study Leadership training - which requires demonstration of knowledge of Process Hazards. |
2020-08-28 |
|
| PS-HAZARD | Process Hazard Knowledge | Master | 2020-08-28 |
Pending
|
|
| Peer Reviewed Project |
P-6052 Author of Terms of reference, Facilitator of HS1 study, author of study report. |
2020-09-20 |
|
| Task | Level of Competency |
Date | Verification Status |
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-24 |
Pending
|
|
| Deliver Training / Present Paper | P-6036. Developed (jointly with DS) the Hazard Study Leader training course. Delivered beta and first training. Positive feedback from reviewers and course delegates. | 2020-07-15 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-24 |
Pending
|
|
| Examination / Qualification | Loughborough University BEng Chemical Engineering. | 2006-07-13 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-24 |
Pending
|
|
| Task Relevant Training (exam) | TUV Sud 61511 Training (TP13050725) | 2013-01-01 |
|