This page is the public summary of the =Method account holder named above, showing the Tasks for which competency has been assessed and the associated status. Further detail on the Competency Register may be found at www.methodcompreg.com.
The =Method Competency register is based on the following key principles
* The Competency Register recognises that it is sometimes clear at interview that an account holder should be awarded a particular Task status, but it is not possible for them to provide evidence of projects completed with previous employers. This position is recognised by the
symbol – which indicates that the account holder needs to complete 4 peer reviewed projects which will be subject to additional scrutiny.
close popup
To access this account please enter the password below. this password will be available from Adrian only.
| Task | Level of Competency |
Date | Verification Status |
| 61511-FSM | Functional Safety Management | Professional | 2020-11-04 |
Pending
|
|
| Task Relevant Training (exam) |
TUV Rheinland FS Engineer course |
2015-03-01 |
|
| 61511-SRS | Safety Requirement Specification | Professional | 2021-03-22 |
Pending
|
|
| General Training (exam) | TUV Rheinland for 61511 covers basic training on SRS | 2015-01-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| HRA-ALARP | As low as reasonably practicable | Professional | 2023-01-28 |
Pending
|
|
| Peer Reviewed Project |
P-6179. Verified ALARP study. |
2023-03-16 |
|
| HRA-ALARP | As low as reasonably practicable | Professional | 2023-01-28 |
Pending
|
|
| Projects |
Adrian wrote: "Generally aware of ALARP demonstration and CBA but not directly involved in previous ALARP demonstration studies." |
2023-01-26 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| Peer Reviewed Project | P-6120. LOPA study of Low Waste Gas hazard scenario in a steel industry application. Facilitator and author of terms of reference and study report. | 2022-05-17 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-6127. LOPA of tank storage application, base on "typicals" approach. Author of report. | 2022-05-09 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-6073. Existing HAZOP review and new LOPA for containerised CHP on behalf of package vendor. Verifier. | 2021-11-07 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-6069. Layer of Protection Analysis (LOPA) study on steel plant continuous annealing process. Verifier of Terms of Reference. | 2021-06-24 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-6025. LOPA of foam manufacturing process. Author of report. | 2020-03-09 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-2391B. Review of earlier LOPA at chemical works. Author of report. | 2019-11-14 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-6014. LOPA of proposals to re-instante pipeline to tank storage facility. Checker of report. | 2019-10-30 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-6014. Verifier of Terms of Reference and HazOp Study report of Tank Storage Application. Subject to subsequent review by HSE. | 2019-10-25 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-2373B. Review of earlier LOPA for drinks industry storage and off-loading. Checker of report. | 2019-09-26 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-6009. LOPA of explosives production processes. Checker of report. | 2019-09-12 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-6006. LOPA of water utility aqueduct. Checker of report. | 2019-08-13 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| P-2241. HazOp of pharmaceutical mixing system. Checker of report. | 2018-10-25 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| Projects | Review of LOPA as part of expert witness case (no formal report, so not promoted to Knowledge) | 2019-08-15 |
|
| HRA-LOPA | Layer of Protection Analysis | Master | 2020-08-19 |
Pending
|
|
| LOPA Chair for new energy from waste plant. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
| Peer Reviewed Project |
P-6164. Verification of HazOp study. |
2023-03-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6164. Verification of HazOp study. |
2023-03-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6126. HazOp of solvent recovery distillation columns. Facilitator and author of worksheets and report. |
2023-02-20 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6143B. HazOp study of water and steam processes for a boiler. Verifier of report. |
2022-11-28 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6143A. HazOp of steel industry Blast Furnace Gas Distribution System. Study facilitator and Author of study report. |
2022-09-30 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6118. HazOp study to examine the risks associated with chemicals distillation process. Author. |
2021-12-14 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6092. Site-wide re-HazOp study, defining and then using “typicals” to reduce study time. Author of Terms of Reference and Study Leader. |
2021-11-08 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6062. HazOp of steel industry batch annealing process. Assessor and report author. |
2021-02-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6053. HazOp of steel industry continuous annealing process line. Assessor and report author |
2021-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-2391B. Review of earlier HazOp at chemical works. Author of report. |
2019-11-14 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6013. HazOp of foam manufacturing operation. Author of report. |
2019-10-22 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-2373B. Review of earlier HazOp for drinks industry storage and off-loading. Checker of report. |
2019-09-26 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P=6015. HazOp of approach to re-starting explosives plant after fire. Author of report. |
2019-09-19 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6008C. HazOp of explosives manufacturing operation - verifier of report. |
2019-09-06 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6008B HazOp of explosives manufacturing operation - HazOp facilitator and author of report. |
2019-09-06 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-6008A. HazOp of explosives manufacturing operation - verifier of report. |
2019-09-06 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
P-2241 HazOp of pharmaceutical application, Germany - verifier of report |
2018-10-25 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
| Projects |
HazOp Chair for Refinery, reinstating pipeline to major storage depot. No evidence of formal peer review, so not promoted to Knowledge |
1999-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
HazOp Chair for new energy from waste plant. No evidence of formal peer review, so not promoted to Knowledge. |
1999-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Master | 2020-08-19 |
Pending
|
|
|
PHA Chair for refinery project Bahrain. No evidence of formal peer review, so not promoted to Knowledge. |
1999-01-01 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-09-03 |
Pending
|
|
| Peer Reviewed Project |
P-6084. HazID of defence industry fuel storage system. Report Verifier. |
2021-04-14 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-09-03 |
Pending
|
|
|
P-6043. HAZID study of oil fuel depot update. Author of report. |
2020-05-26 |
|
| HRA-HS2 | Hazard Identification and Understanding | Master | 2020-09-03 |
Pending
|
|
| Projects |
P-6038. Author of "Terms of Reference" for a Process Hazard Review of ink storage facility (project not taken through to completion - not peer reviewed). |
2020-02-27 |
|
| HRA-HS0/1 | Inherent Safety and Initial Hazard Review | Professional | 2020-08-28 |
Pending
|
|
| Projects |
P-6052. Verifier of Terms of Reference for HS1 study |
2020-09-20 |
|
| HRA-HS0/1 | Inherent Safety and Initial Hazard Review | Professional | 2020-08-28 |
Pending
|
|
|
General experience of H&RA. (To be updated when formal listing of projects completed available). |
2020-08-28 |
|
| HRA-MEET | Hazard Study Meeting Management | Master | 2020-08-29 |
Pending
|
|
| Projects |
Considerable experience in delivering hazard study facilitation - and has demonstrated a high level of competence in meeting management. |
2020-08-28 |
|
| Task | Level of Competency |
Date | Verification Status |
| PS-DSEAR | Dangerous Substances and Explosive Atmospheres Assessment | Master | 2023-04-12 |
Pending
|
|
| Projects | DSEAR assessment of machinery including area classification for confectionery manufacturer. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|
| PS-DSEAR | Dangerous Substances and Explosive Atmospheres Assessment | Master | 2023-04-12 |
Pending
|
|
| DSEAR risk assessment including hazardous area classification for pharma company. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|
| PS-DSEAR | Dangerous Substances and Explosive Atmospheres Assessment | Master | 2023-04-12 |
Pending
|
|
| DSEAR and fire risk assessments for large fuel storage depot. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|
| PS-DSEAR | Dangerous Substances and Explosive Atmospheres Assessment | Master | 2023-04-12 |
Pending
|
|
| DSEAR assessments for UK energy from waste plants. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|
| PS-DSEAR | Dangerous Substances and Explosive Atmospheres Assessment | Master | 2023-04-12 |
Pending
|
|
| Task Relevant Training (no exam) | Chilworth Technology. Process Safety in ATEX and DSEAR | 2008-01-01 |
|
| PS-HAZARD | Process Hazard Knowledge | Master | 2020-08-30 |
Pending
|
|
| Projects |
Broad experience of H&RA facilitation. Note that completed projects would be added as activities related to the specific hazard study, not repeated here. |
2020-08-28 |
|
| Task | Level of Competency |
Date | Verification Status |
| PUWER | Provision and Use of Work Equipment Regulations Risk Asssessment | Master | 2022-11-30 |
Pending
|
|
| Peer Reviewed Project | P-2411. PUWER assessment of machine in metals recover application. Author of report. | 2020-03-23 |
|
| PUWER | Provision and Use of Work Equipment Regulations Risk Asssessment | Master | 2022-11-30 |
Pending
|
|
| Projects | P-6059. PUWER assessment of new tank farm. Author of report. | 2022-10-01 |
|
| PUWER | Provision and Use of Work Equipment Regulations Risk Asssessment | Master | 2022-11-30 |
Pending
|
|
| PUWER assessment of bottling lines for major fizzy drinks manufacturer. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|
| PUWER | Provision and Use of Work Equipment Regulations Risk Asssessment | Master | 2022-11-30 |
Pending
|
|
| PUWER assessment of machinery including area classification for confectionery manufacturer. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|
| PUWER | Provision and Use of Work Equipment Regulations Risk Asssessment | Master | 2022-11-30 |
Pending
|
|
| PUWER risk assessment for pharma company. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|
| Task | Level of Competency |
Date | Verification Status |
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| Examination / Qualification | Heriot Watt. MSc Safety, Risk and Reliability. | 2017-01-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| University of Hull. BSc Safety and Environmental Management. | 2010-01-29 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| NEBOSH. Environmental Diploma | 2008-01-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| NEBOSH. Occupational Health & Safety Diploma | 2007-01-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| University of Hull. BEng Mechanical Engineering | 2004-07-14 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| NEBOSH. National General Certificate | 2001-01-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| Humberside Engineering College. HND Engineering Design | 1994-01-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| General Training (exam) | TUV Rheinland 61511 training ID 10075/15 | 2015-01-01 |
|
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-07-25 |
Pending
|
|
| Projects | QRA and Safety Management review for Gas plant. No evidence of formal peer review, so not promoted to Knowledge. | 1999-01-01 |
|