=Method Group
More information about this page | Visit www.methodcompreg.com
This page is the public summary of the =Method account holder named above, showing the Tasks for which competency has been assessed and the associated status. Further detail on the Competency Register may be found at www.methodcompreg.com.
The =Method Competency register is based on the following key principles
* The Competency Register recognises that it is sometimes clear at interview that an account holder should be awarded a particular Task status, but it is not possible for them to provide evidence of projects completed with previous employers. This position is recognised by the
symbol – which indicates that the account holder needs to complete 4 peer reviewed projects which will be subject to additional scrutiny.
close popup
To access this account please enter the password below. this password will be available from Jon only.
| Task | Level of Competency |
Date | Verification Status |
| 61511-FSM | Functional Safety Management | Master | 2020-09-17 |
Pending
|
|
| Deliver Training / Present Paper |
Presented shortfalls of Functional Safety Management @ InstMc FS2017 |
2017-11-21 |
|
| 61511-FSM | Functional Safety Management | Master | 2020-09-17 |
Pending
|
|
| Peer Reviewed Project |
P-2128 Functional Safety Management Procedures - Chemical Process Plant, Author of report. |
2018-02-20 |
|
| 61511-FSM | Functional Safety Management | Master | 2020-09-17 |
Pending
|
|
|
P-2002 Installed Systems Management Procedures - Chemical Storage Facility - author of procedures. |
2017-05-22 |
|
| 61511-FSM | Functional Safety Management | Master | 2020-09-17 |
Pending
|
|
| Projects |
Assistance in reviewing, prioritising and clearing FSA 4 actions as a Functional Safety Management and Operations Study subject matter expert.
|
2020-09-01 |
|
| 61511-SRS | Safety Requirement Specification | Professional | 2020-09-18 |
Pending
|
|
| Peer Reviewed Project |
P-2704. Review of SRS client template. Checker of Checklist. |
2022-10-01 |
|
| 61511-SRS | Safety Requirement Specification | Professional | 2020-09-18 |
Pending
|
|
| Projects |
P-2493 Reviewer of SRS and maintenance plan to determine if suitable. Not promoted to experience - not formally reviewed. |
2020-08-06 |
|
| 61511-FSA1 | Stage 1 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
| Peer Reviewed Project |
P-0270 FSA 1 Overfill Protection System - Checker of Report |
2016-02-08 |
|
| 61511-FSA1 | Stage 1 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-0249 FSA 1 Pharmaceutical Plant - Checker of Report |
2015-12-15 |
|
| 61511-FSA1 | Stage 1 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-0236 FSA 1 Pharmaceutical Plant (centrifuge system protection)- Checker of Report |
2015-08-22 |
|
| 61511-SILV&C | SIL Verification and Calculation | Professional | 2020-09-18 |
Pending
|
|
| Projects |
P-0270 Design verification of overfill protection system. |
2016-02-08 |
|
| 61511-FAT/SAT | Clauses 13 / 15 - Factory Acceptance Test / SIS Safety Validation | Master | 2020-09-18 |
Pending
|
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
| Peer Reviewed Project |
P-2274A Spray Dryer review of FSA 2 - updated report and actions. |
2020-03-14 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-2305. FSA 2 of drinks industry storage project. Checker of report. |
2019-03-24 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-2305 FSA2 of Whisky Distillery - author of assessment report. |
2019-02-10 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-2040-2 FSA 2 of Furnace Replacement Project. Checker of report. |
2017-08-17 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-0280 FSA 2 of Oil Re-fractionisation tower. Checker of report. |
2016-12-09 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-0257 FSA 2 of Refinery Hydrogenation Unit. Author of report. |
2016-09-28 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-0239 FSA 2 of Chemical Storage Facility. Author of report. |
2016-03-21 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-0249 FSA 2 Pharmaceutical Plant - Checker of Report |
2015-12-15 |
|
| 61511-FSA2 | Stage 2 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-0236 FSA 2 Pharmaceutical Plant (centrifuge protection)- Checker of Report. |
2015-08-22 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
| Peer Reviewed Project |
P-2833. FSA 3 of offshore gas platform upgrade. Author of report. |
2023-01-16 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-2767. FSA 3 (part of FSA 1-3) of Chlorine Manufacturer site. Checker of checklists. |
2022-08-26 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-2274 FSA 3 Spray Dryer - Assessor and author of report. |
2020-08-07 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-2328 FSA3 of Process Plant (Sulphur) - author of assessment report. |
2019-04-10 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-2027. FSA 3 Tank Storage - Overfill Protection System - author of report. |
2019-02-10 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-2027-3 FSA 3 - Overfill Protection Tank Farm author of report. |
2018-09-10 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-2040-3 FSA 3 of Furnace Replacement project. Author of assessment report. |
2017-10-03 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-2006 FSA3 Nitrogen blanketing system -author of report. |
2017-08-08 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-2046 FSA3 of Process Plant - author of report. |
2017-05-30 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-0249 FSA 3 Pharmaceutical Plant - Author of Report |
2016-12-15 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-0281. FSA3 of over temperature system for refinery fractionation tower. Author of report. |
2016-11-28 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-0239 FSA 3 of Refinery Hydrogenation Unit. Author of report. |
2016-09-28 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-0239 FSA 3 of Chemical Storage Facility. Author of report. |
2016-03-21 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-0234. FSA 3 of isomerisation unit re-instrumentation project. Checker of report. |
2015-09-27 |
|
| 61511-FSA3 | Stage 3 Functional Safety Assessment | Master | 2020-09-18 |
Pending
|
|
|
P-0236 FSA 3 Pharmaceutical Plant (centrifuge protection)- Author of Report |
2015-08-22 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
| Deliver Training / Present Paper |
2020/04 Delivered FSComp Tech Training Live On-line MAN2004 |
2020-08-07 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2020/04 Delivered FSComp Technician Training MAN2004 |
2020-04-09 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2020/02 Delivered FSComp Technician Training NEW2002 |
2020-02-19 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2020/02 Delivered FSComp Technician Training SCO2002 |
2020-02-06 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2020/01 Delivered FSComp Technician Training WAL2001 |
2020-01-29 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2020/01 Delivered FSComp Technician Training NEW2001 |
2020-01-21 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2020/01 Delivered FSComp Technician Training MAN2001 |
2020-01-15 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2020/01 Delivered FSComp Operator Training MAN2001 |
2020-01-14 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2020/01 Delivered FSComp Operator Training MAN2001 |
2020-01-07 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/11 Delivered FSComp Technician Training LSE1911 |
2019-11-27 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/11 Delivered FSComp Technician Training MAN1911 |
2019-11-21 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/11 Delivered FSComp Technician Training NEW1911 |
2019-11-13 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/10 Delivered FSComp Technician Training SCO1910 |
2019-10-24 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/10 Delivered FSComp Technician Training SCO1910 |
2019-10-22 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/09 Delivered FSComp Operator Training SCO1909 |
2019-09-17 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/09 Delivered FSComp Operator Training SCO1909 |
2019-09-16 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/10 Delivered FSComp Technician Training SCO1909 |
2019-09-07 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/08 Delivered FSComp Technician Training WAL1908 |
2019-08-07 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/07 Delivered FSComp Technician Training SCO1907 |
2019-07-31 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/07 Delivered FSComp Technician Training SCO1907 |
2019-07-24 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2019/05. Delivered FSComp Technician Training |
2019-05-08 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2018/12. Delivered FSComp Technician Training |
2018-12-13 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2018/11. Delivered FSComp Technician Training |
2018-11-14 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
Plant Handover Training - Development and delivery. Power Station Specific Operations and Maintenance of SIF Training. |
2018-10-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2018/06. Delivered FSComp Technician Training |
2018-06-20 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2018/04. Delivered FSComp Technician Training |
2018-04-18 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2018/03. Delivered FSComp Technician Training |
2018-03-18 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/12. Delivered FSComp Technician Training |
2017-12-12 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/11. Delivered FSComp Technician Training |
2017-11-29 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/11. Delivered FSComp Technician Training |
2017-11-09 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/11. Delivered FSComp Technician Training |
2017-11-07 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/11. Delivered FSComp Technician Training |
2017-11-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/10. Delivered FSComp Technician Training |
2017-10-08 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/10. Delivered FSComp Technician Training |
2017-10-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/06. Delivered FSComp Technician Training |
2017-06-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2017/04. Delivered FSComp Technician Training |
2017-04-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2016/10. Delivered FSComp Technician Training |
2016-10-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2016/06. Delivered FSComp Technician Training |
2016-06-15 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2016/08. Delivered FSComp Technician Training |
2016-06-08 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2016/06. Delivered FSComp Technician Training |
2016-06-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2016/01. Delivered FSComp Technician Training |
2016-02-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2015/12. Delivered FSComp Technician Training |
2015-12-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2015/12. Delivered FSComp Technician Training |
2015-11-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2015/09. Delivered FSComp Technician Training |
2015-09-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2015/07. Delivered FSComp Technician Training |
2015-07-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
2015/06. Delivered FSComp Technician Training |
2015-06-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
P-2249 Operations and Maintenance Manual for Process Plant - author of manual |
2018-09-14 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
| Projects |
Assistance in reviewing, prioritising and clearing FSA 4 actions as a Functional Safety Management and Operations Study subject matter expert.
|
2020-09-01 |
|
| 61511-O&M | Clause 16 SIS Operations and Maintenance | Expert | 2020-09-18 |
Pending
|
|
|
P-2304. Proof test verification |
2020-06-23 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
| Peer Reviewed Project |
P-2609E. FSA 4 of steel industry sinter plant. Report Checker. |
2022-03-19 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2609D. FSA 4 of steel granular coal injection plant. Report Checker. |
2022-03-17 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2609C. FSA 4 of steel industry blast furnace. Report Verifier. |
2021-10-28 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2661. FSA 4 of pharmaceutical tank farm. Report Verifier. |
2021-10-13 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2579. FSA 4 of industrial chemicals (chlor-alkali) plant. Report Verifier. |
2021-07-31 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2609A. FSA 4 of steel industry blast furnace. Report Author. |
2021-06-24 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2634. FSA 4 of pharma industry tank farm. Report Author. |
2021-06-22 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2552. FSA 4 of steel industry continuous annealing plant. Report Author. |
2021-05-18 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2373D FSA4 of Whisky industry storage facility - author of assessment report. |
2020-08-17 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P2489 FSA 4 of Steel Plant Hot Mill Re-heat furnaces.FSM, SLC and Clause 16 O&M considered as part of the assessment.
Assessor and author of report.
|
2020-08-07 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2489. Author of Stage 4 FSA on steel manufacturing "hot mill" application. |
2020-07-01 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2366 - FSA4 of Ethylene tetrafluoroethylene (ETFE) Plant - author of assessment report. |
2019-07-10 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2329 FSA 4 of Continuous Annealing Process (CAPL) Steel Manufacturer - author of assessment report. |
2019-05-10 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2328 FSA4 of Process Plant (Sulphur) - author of assessment report. |
2019-04-10 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2105 FSA4 of Chemical storage facility - author of assessment report. |
2017-12-28 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-0332 FSA 4 of Chemical Processing Site. Author of report. |
2016-11-12 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-0249 FSA 4 Pharmaceutical Plant - Author of Report |
2015-12-15 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-0236 FSA 4 Pharmaceutical Plant (centrifuge protection)- Author of Report |
2015-08-22 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
| Projects |
P-2750m. Providing advice to FMCG client on operations and maintenance approach. |
2022-06-01 |
|
| 61511-FSA4 | Stage 4 Functional Safety Assessment | Master | 2020-09-17 |
Pending
|
|
|
P-2484 FSA 4 review of actions in light of new process safety information. |
2020-06-20 |
|
| 61511-FSA5 | Modification and Stage 5 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
| Peer Reviewed Project |
P-2483.S012. FSA 5 of chemical plant installation of new SIF instrumentation. Checker of report. |
2022-02-10 |
|
| 61511-FSA5 | Modification and Stage 5 Functional Safety Assessment | Professional | 2020-09-18 |
Pending
|
|
|
P-2264 FSA5 of Process Plant - checker of assessment report. |
2019-01-10 |
|
| Task | Level of Competency |
Date | Verification Status |
| HRA-LOPA | Layer of Protection Analysis | Professional | 2020-09-17 |
Pending
|
|
| Projects |
P-6006 LOPA of Critical infrastructure - participant. |
2019-03-10 |
|
| HRA-LOPA | Layer of Protection Analysis | Professional | 2020-09-17 |
Pending
|
|
|
P-2143B LOPA of Oil Tank Storage Facility - participant. |
2018-07-23 |
|
| HRA-LOPA | Layer of Protection Analysis | Professional | 2020-09-17 |
Pending
|
|
| Task Relevant Training (no exam) |
Layer of Protection Analysis - Workshop/training |
2018-10-18 |
|
| HRA-HAZOP | Hazard and Operability Study | Professional | 2020-09-17 |
Pending
|
|
| Projects |
P-6053. HazOp of steel industry continuous annealing process line. Scribe. |
2021-01-01 |
|
| HRA-HAZOP | Hazard and Operability Study | Professional | 2020-09-17 |
Pending
|
|
|
P-6002 HazOp participation
|
2019-03-07 |
|
| HRA-HAZOP | Hazard and Operability Study | Professional | 2020-09-17 |
Pending
|
|
|
P-2143A HazOp Participation
|
2018-06-18 |
|
| Task | Level of Competency |
Date | Verification Status |
| PS-COMAH | Control of Major Accident Hazards Reporting | Professional | 2020-09-18 |
Pending
|
|
| Task Relevant Training (exam) |
COMAH Responsibilities for Duty Holders |
2013-11-10 |
|
| Task | Level of Competency |
Date | Verification Status |
| PUWER | Provision and Use of Work Equipment Regulations Risk Asssessment | Professional | 2020-09-17 |
Pending
|
|
| Task Relevant Training (exam) |
TUV SUD FS Machinery Safety Training |
2020-03-12 |
|
| 12100 | ISO 12100 Safety of Machinery Risk Assessment | Professional | 2020-09-17 |
Pending
|
|
| Task Relevant Training (exam) |
TUV SUD FS Machinery Safety Training |
2020-03-12 |
|
| Task | Level of Competency |
Date | Verification Status |
| ECI-CONTROL | Programming and control fundamentals | Pending Review | 2021-09-08 |
Pending
|
|
| Projects | New task for project | 2021-09-08 |
|
| ECI-INST | Field devices - measurement principles and final elements | Master | 2022-11-22 |
Pending
|
|
| Projects |
New task for project |
2021-09-08 |
|
| ECI-LVELEC | Electrical devices and systems <1kV | Pending Review | 2021-09-08 |
Pending
|
|
| Projects | New task for project | 2021-09-08 |
|
| ECI-HVELEC | Electrical devices and systems >1kV | Pending Review | 2021-09-08 |
Pending
|
|
| Projects | New task for project | 2021-09-08 |
|
| ECI-ATEX | ATEX instrumentation | Pending Review | 2021-09-08 |
Pending
|
|
| Projects | New task for project | 2021-09-08 |
|
| Task | Level of Competency |
Date | Verification Status |
| GENERAL | Activities Relevant to multiple tasks | Pending Review | 2020-09-17 |
Pending
|
|
| General Training (exam) | TuV Functional Safety Professional (TP18051434) Jan 2018 | 2018-01-01 |
|