Verified Competency Register for Dr Jeni Lewthwaite

=Method Group

More information about this page | Visit www.methodcompreg.com

Login to view account

To access this account please enter the password below. this password will be available from Dr Jeni only.


61511

Task Level of
Competency
Date Verification
Status
61511-FSM | Functional Safety Management Master 2018-08-16
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2736. Checker of FS Audit of petrochemical plant FSM procedures.More information   2022-05-20
Approved
Not Verified
Unable to Verify
61511-FSM | Functional Safety Management Master 2018-08-16
Verified
Pending
Initial Assessment 
P-2074-2. FS Audit and Assessment of Dockyard Crane SIF design. Checker of report.More information   2018-08-16
Approved
Not Verified
Unable to Verify
61511-SRS | Safety Requirement Specification Master 2021-03-05
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2584. Verification of SRS for pharmaceutical industry SIFs.More information   2021-03-05
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Master 2022-08-19
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2831. FSA 1 of upgrade to offshore gas platform. Author of report.More information   2022-11-01
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Master 2022-08-19
Verified
Pending
Initial Assessment 
P-2705. FSA 1 of Steel Industry Continuous Annealing Process Line. Checker of report.More information   2022-10-01
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Master 2022-08-19
Verified
Pending
Initial Assessment 
P-2764. FSA 1 of offshore gas facility modification. Author of report.More information   2022-07-27
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Master 2022-08-19
Verified
Pending
Initial Assessment 
P-2573 FSA 1 of Scottish whisky industry tanker loading - checker of reportMore information   2022-01-11
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Master 2022-08-19
Verified
Pending
Initial Assessment 
P-2262. FSA 1 of emulsion plant for explosives manufacturer. Author of report.More information   2019-01-29
Approved
Not Verified
Unable to Verify
61511-FSA1 | Stage 1 Functional Safety Assessment Master 2022-08-19
Verified
Pending
Initial Assessment 
P-2141. FSA1 of Acid storage project. Checker of report.More information   2018-07-09
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2018-06-01
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-5029. To calculate an average Probability of Failure on Demand (PFDavg) for a complex SIF. Author of calculations.More information   2021-10-17
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2018-06-01
Verified
Pending
Initial Assessment 
P-2382. SIL V&C of terminal and tank storage application. Author of report.More information   2020-06-05
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2018-06-01
Verified
Pending
Initial Assessment 
P-2391C. SIL V&C for plastics manufacturer. Author of checklists and report.More information   2020-02-27
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2018-06-01
Verified
Pending
Initial Assessment 
P-2136. SIL Verification of SIFs for power generation project - conversion from coal to wood chip fuel. Author of report.More information   2018-06-01
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2018-06-01
Verified
Pending
Initial Assessment 
Projects P-2673m. Providing advice on SIL verification of legacy SIF.More information   2021-10-01
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2018-06-01
Verified
Pending
Initial Assessment 
P-2584. FSA1 begun but abandoned following review that identified inherently safe alternative solution, not formally peer reviewed.More information   2021-04-02
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2018-06-01
Verified
Pending
Initial Assessment 
P-2263. SIL V&C of chemical plant SIF. Author of report. Project cancelled, so not promoted to Knowledge.More information   2019-03-25
Approved
Not Verified
Unable to Verify
61511-SILV&C | SIL Verification and Calculation Master 2018-06-01
Verified
Pending
Initial Assessment 
P-2193. SILV&C Checklists for Acid Storage project. No formal peer review, so activity not promoted to Peer reviewed Project. Checker of report.More information   2019-01-24
Approved
Not Verified
Unable to Verify
61511-FSA2 | Stage 2 Functional Safety Assessment Master 2021-03-05
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2274. FSA 2 for precious metals recovery application (spray dryer). Author of report.More information   2020-04-15
Approved
Not Verified
Unable to Verify
61511-FSA2 | Stage 2 Functional Safety Assessment Master 2021-03-05
Verified
Pending
Initial Assessment 
P-2074-2. FSA 2 of crane safety system application. Checker of report.More information   2018-07-01
Approved
Not Verified
Unable to Verify
61511-FSA2 | Stage 2 Functional Safety Assessment Master 2021-03-05
Verified
Pending
Initial Assessment 
Projects P-2021. FSA 2 report in to pharmaceutical industry tank storage application. Project not completed, so not promoted to Knowledge. Checker of reportMore information   2018-12-16
Approved
Not Verified
Unable to Verify
61511-PRIOR USE | Prior Use Compliance Assessment Master 2017-06-26
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-5012 Proven in use assessment of gate valve. Co-author and co-verifier of proven in use assessment reportMore information   2020-08-17
Approved
Not Verified
Unable to Verify
61511-PRIOR USE | Prior Use Compliance Assessment Master 2017-06-26
Verified
Pending
Initial Assessment 
P-5012. Proven in Use and Prior Use assessment, including FMEA and manufacturing assessment. Reviewed by HSE as part of close out of action legal. Author of Prior Use report.More information   2020-06-02
Approved
Not Verified
Unable to Verify
61511-PRIOR USE | Prior Use Compliance Assessment Master 2017-06-26
Verified
Pending
Initial Assessment 
P-2003. Prior use assessment of pilot burner from refinery. Author of report.More information   2017-06-26
Approved
Not Verified
Unable to Verify
61511-PRIOR USE | Prior Use Compliance Assessment Master 2017-06-26
Verified
Pending
Initial Assessment 
Projects P-5032 Preliminary investigation to determine likelihood of success of a prior use assessment on waste industry SIF.More information   2022-02-22
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Professional 2023-01-22
Verified
Pending
Initial Assessment 
Projects - Analysis of MoD fault reporting tools to identify trends, estimate system and sub-system in-service reliability and compare to modelled reliability predictions. Recommend system/sub-system improvement notices based on analysis - Various MoD fixed wing aircraft project teams over 10 year period. More information   2022-01-01
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Professional 2023-01-22
Verified
Pending
Initial Assessment 
- Undertook impact analysis for modification of air traffic control equipment components (hardware and software) within legacy systems and produce safety documentation to gain approval for modifications from duty holders - Aquila Air Traffic Management - contracts over a 6 year period. More information   2022-01-01
Approved
Not Verified
Unable to Verify
61511-FSA4 | Stage 4 Functional Safety Assessment Professional 2023-01-22
Verified
Pending
Initial Assessment 
Physical Risk Assessment of ATM assets, specifying requirements for O&M manuals to ensure procedural mitigations are addressed e.g. operational limitations, frequency of testing, competence of maintainers etc. - Aquila Air Traffic Management - contracts over a 6 year period.More information   2022-01-01
Approved
Not Verified
Unable to Verify

61508

Task Level of
Competency
Date Verification
Status
61508-FSM | Functional Safety Management Master 2018-10-31
Verified
Pending
Initial Assessment 
Deliver Training / Present Paper P-2093. Design and delivery of workshop in 61508 compliance to gas detector supplier.   2018-10-31
Approved
Not Verified
Unable to Verify
61508-FSM | Functional Safety Management Master 2018-10-31
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2088. Author of FSM (CASS) assessment of systems integrator commissioned by end user. Checker of report.   2018-01-01
Approved
Not Verified
Unable to Verify
61508-FSM | Functional Safety Management Master 2018-10-31
Verified
Pending
Initial Assessment 
P-2103. Assessment and certification of 4-20mA pressure transmitter. Checker of report.   2017-09-20
Approved
Not Verified
Unable to Verify
61508-FSM | Functional Safety Management Master 2018-10-31
Verified
Pending
Initial Assessment 
Projects P-2089. Delivery of workshop related to assessment of pressure transmitter compliance with IEC 61508, including review of approach to FSM.   2017-08-25
Approved
Not Verified
Unable to Verify
61508-PART2 | (Hardware) Requirements for E/E/PE Safety-Related Systems Master 2018-10-31
Verified
Pending
Initial Assessment 
Deliver Training / Present Paper P-2093. Design and delivery of workshop in 61508 compliance to gas detector supplier.   2018-10-31
Approved
Not Verified
Unable to Verify
61508-PART2 | (Hardware) Requirements for E/E/PE Safety-Related Systems Master 2018-10-31
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2103. Assessment and certification of 4-20mA pressure transmitter. Checker of report.   2017-09-29
Approved
Not Verified
Unable to Verify
61508-PART2 | (Hardware) Requirements for E/E/PE Safety-Related Systems Master 2018-10-31
Verified
Pending
Initial Assessment 
Projects P-2089. Delivery of workshop related to assessment of pressure transmitter compliance with IEC 61508, including review of approach based on 61508-2.   2017-08-25
Approved
Not Verified
Unable to Verify
61508-FMEADEV | Failure Modes and Effects Analysis (Device level) Master 2020-06-09
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-5012. Proven in Use assessment, including FMEA and manufacturing assessment. Reviewed by HSE as part of close out of action legal. Checker of FMEA.   2020-06-09
Approved
Not Verified
Unable to Verify
61508-PIU | Route 2 Compliance Assessment Master 2017-07-03
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-5026. Proven in use compliance assessment for electric actuator. Author.   2021-05-20
Approved
Not Verified
Unable to Verify
61508-PIU | Route 2 Compliance Assessment Master 2017-07-03
Verified
Pending
Initial Assessment 
P-5012. Proven in Use assessment, including FMEA and manufacturing assessment. Reviewed by HSE as part of close out of action legal. Author of PiU report.   2020-06-09
Approved
Not Verified
Unable to Verify
61508-PIU | Route 2 Compliance Assessment Master 2017-07-03
Verified
Pending
Initial Assessment 
P-2103. Assessment and certification of 4-20mA pressure transmitter. Author of report.   2017-09-20
Approved
Not Verified
Unable to Verify
61508-PIU | Route 2 Compliance Assessment Master 2017-07-03
Verified
Pending
Initial Assessment 
P-2003. Proven in Use assessment of pilot burner - checker of FMEA and author of report analysing returns data.   2017-07-03
Approved
Not Verified
Unable to Verify
61508-PIU | Route 2 Compliance Assessment Master 2017-07-03
Verified
Pending
Initial Assessment 
Projects P-2089. Delivery of workshop related to assessment of pressure transmitter compliance with IEC 61508, including review of approach based on Proven in Use.   2017-08-25
Approved
Not Verified
Unable to Verify

HAZARD AND RISK ASSESSMENT

Task Level of
Competency
Date Verification
Status
HRA-LOPA | Layer of Protection Analysis Master 2013-01-01
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-6120. LOPA study of Low Waste Gas hazard scenario in a steel industry application. Verifier of study report.More information   2022-05-17
Approved
Not Verified
Unable to Verify
HRA-LOPA | Layer of Protection Analysis Master 2013-01-01
Verified
Pending
Initial Assessment 
P-6127. LOPA of tank storage application, base on "typicals" approach. Verifier of report.More information   2022-05-09
Approved
Not Verified
Unable to Verify
HRA-LOPA | Layer of Protection Analysis Master 2013-01-01
Verified
Pending
Initial Assessment 
P-6113. Updating the LOPA studies done for tanker bottom loading, providing a table of standard ignition probability values applicable to ethanol and updating client risk matrix. Verifier. More information   2021-12-09
Approved
Not Verified
Unable to Verify
HRA-LOPA | Layer of Protection Analysis Master 2013-01-01
Verified
Pending
Initial Assessment 
P-6069. Layer of Protection Analysis (LOPA) study on steel plant continuous annealing process. Verifier of study report.More information   2021-06-24
Approved
Not Verified
Unable to Verify
HRA-LOPA | Layer of Protection Analysis Master 2013-01-01
Verified
Pending
Initial Assessment 
P-2497. Providing Process and Functional Safety consultancy and guidance for a Floodgate Controller project. Verifier.More information   2021-01-01
Approved
Not Verified
Unable to Verify
HRA-LOPA | Layer of Protection Analysis Master 2013-01-01
Verified
Pending
Initial Assessment 
Task Relevant Training (no exam) SafetTech Engineering LOPA Training CourseMore information   2013-01-01
Approved
Not Verified
Unable to Verify
HRA-HAZOP | Hazard and Operability Study Professional 2022-08-18
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-6168. Update to HazOp and LOPA studies for storage tanks due to site extension. Verifier of study report.   2022-09-30
Approved
Not Verified
Unable to Verify
HRA-HAZOP | Hazard and Operability Study Professional 2022-08-18
Verified
Pending
Initial Assessment 
P-6143A. HazOp of steel industry Blast Furnace Gas Distribution System. Verifier (mentored) of study report.   2022-09-30
Approved
Not Verified
Unable to Verify
HRA-HAZOP | Hazard and Operability Study Professional 2022-08-18
Verified
Pending
Initial Assessment 
Projects First experience was 'on-the-job' training about twenty years ago when I secretaried HazOps for some nuclear and wind projects. Not had formal training just on HazOp, although it has come up in the content of a couple of training courses I think. Apart from that I was secretary at a couple of for ERA and then the FSA1/HazOp review work that I have done for =M.   2022-08-17
Approved
Not Verified
Unable to Verify
HRA-HS2 | Hazard Identification and Understanding Master 2021-12-30
Verified
Pending
Initial Assessment 
Projects Activities recorded for 2017 date in HRA-HS0/1 also included HS2, not repeated here, but are relevant to HRA-HS2.   2017-01-01
Approved
Not Verified
Unable to Verify
HRA-HS2 | Hazard Identification and Understanding Master 2021-12-30
Verified
Pending
Initial Assessment 
HS2/3 for the trials and training facilities at the QinetiQ Farnborough site, such as the Man Carrying Centrifuge and the 5m Wind Tunnel. (2 year project).   2014-01-01
Approved
Not Verified
Unable to Verify
HRA-HS0/1 | Inherent Safety and Initial Hazard Review Master 2021-12-30
Verified
Pending
Initial Assessment 
Projects P-6122mB. Feedback on HS1 for Steel Industry axial steam engine application.   2022-01-19
Approved
Not Verified
Unable to Verify
HRA-HS0/1 | Inherent Safety and Initial Hazard Review Master 2021-12-30
Verified
Pending
Initial Assessment 
P-6122mA. Feedback on HS1 for Steel Industry flare gas application.   2022-01-11
Approved
Not Verified
Unable to Verify
HRA-HS0/1 | Inherent Safety and Initial Hazard Review Master 2021-12-30
Verified
Pending
Initial Assessment 
HS0/1/2 for the Project Marshall upgrade of MoD Air Traffic Management capabilities at all MoD operated sites in the UK and overseas. (Project still ongoing in December '21).   2017-01-01
Approved
Not Verified
Unable to Verify
HRA-HS0/1 | Inherent Safety and Initial Hazard Review Master 2021-12-30
Verified
Pending
Initial Assessment 
HS0/1/2 activities for the tlm Nexus Carbon/Resolve software product as utilised by the UK MoD Typhoon team.   2017-01-01
Approved
Not Verified
Unable to Verify
HRA-HS0/1 | Inherent Safety and Initial Hazard Review Master 2021-12-30
Verified
Pending
Initial Assessment 
Jeni lead an evaluation of the resultant risk from fire and explosion hazards on the Airseeker platform. Activities included liaising with the UK MoD project team to determine relevant information, evaluation of that information against the extant risk assessment and reporting of information within the hazard assessment documentation.   2017-01-01
Approved
Not Verified
Unable to Verify

PROCESS SAFETY

Task Level of
Competency
Date Verification
Status
PS-HAZARD | Process Hazard Knowledge Professional 2021-12-30
Verified
Pending
Initial Assessment 
Projects Jeni has background knowledge of process hazards and much experience of hazards associated with work in the military and defence fields, carrying out hazard studies based on FMEA and SWIFT techniques. Jeni has limited experience of process hazards associated with general process industries.   2021-12-30
Approved
Not Verified
Unable to Verify

GENERAL

Task Level of
Competency
Date Verification
Status
FS-APPROVE | Approval of FS related documentation Master 2022-10-31
Verified
Pending
Initial Assessment 
Informal Training Jeni reviewed requirements for FS-APPROVE with JS and SE (both of whom hold MST status for this competency task).More information   2022-05-10
Approved
Not Verified
Unable to Verify
FS-APPROVE | Approval of FS related documentation Master 2022-10-31
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-2736. FS Audit. Approval of audit reports.More information   2022-06-30
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Deliver Training / Present Paper IET International Conference on System Safety and Cyber Security (2014). Safety Assessment of Smart Instruments for the Nuclear Industry.   2014-10-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Civil-Comp Press - Conference on Computational Structures Technology. Risk modelling of fires and explosions in offshore platform modules.   2006-09-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
IMechE Proceedings of the Institution of Mechanical Engineers, Part O : Journal of Risk and Reliability. Risk modelling of fires and explosions in open-sided offshore platform modules   2006-01-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Advances in Reliability Technology Symposium (ARTS) conference.Risk modelling of fires and explosions in open-sided offshore platform modules.   2005-01-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Examination / Qualification IET Chartered Engineer   1999-01-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Loughborough University - BEng Mathematical Engineering.   1999-01-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Loughborough University (and Mobil NS Ltd) - PhD Risk and Reliability Engineering   1999-01-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Peer Reviewed Project P-5024. Outside scope of competency register. Evaluation of impact of safety fault on fire door. Providing expert guidance on strategy and requirements of product recall.   2021-02-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
P-5017. Project outside scope of competency register. Author: Evaluation of the impact of an increased product failure rate on the likelihood of fatality resulting from a fire. Cost benefit analysis to determine at what point it can no longer be argued that implementing a programme or replacement of the suspected faulty product is grossly disproportionate. Estimate of required test periodicity for the product dependent on the system PFD required by the end-user. Checker: Validation of risk model, cost benefit analysis and test period calculations through review of input data, calculations and comparison of output with related project experience.   2021-01-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
P-5001. Project outside scope of competency register. Review of warranty returns for fire and gas detector supplier - determining "action" levels for remedial action based on number of returns. Author of report.   2019-03-29
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Task Relevant Training (exam) TUV Sud 61511 Functional Safety Professional.   1999-01-01
Approved
Not Verified
Unable to Verify
GENERAL | Activities Relevant to multiple tasks Pending Review 2019-03-29
Verified
Pending
Initial Assessment 
Task Relevant Training (no exam) DNV - MoD Ship Safety Management Course (SSMO)   1999-01-01
Approved
Not Verified
Unable to Verify